So, you are telling me that, on the "orange" link of the
second (B) bend, you have replaced the
one simple bight opening, with the
two girth hitch openings, in an effort to reduce further any communication between the two "orange" ends - is that correct ?
On the
first bend, I have also used the (one opening of a) girth hitch, to further secure the bight end of the "white" link. However, I thought that the structure of the "white" sheet bend there would be adequate to absorb a somewhat uneven loading of its two 'white" ends, so I have not used the bulkier overhand knot .
( A picture of your solution would not be
completely redundant, I believe !
)